IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
NAICS 311613 Rendering and Meat Byproduct Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0278 # 03 Y:2023 03 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $175,901 $710,922 Not Implemented
IC0278 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $147,541 $1,271,712 Not Implemented
IC0278 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,040 $600 Implemented
IC0278 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,879 $15,415 Not Implemented
MZ0309 # 06 Y:2021 06 2021 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $353,125 $770,000 Not Implemented
MZ0309 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,876 $42,513 Not Implemented
MZ0309 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,714 $960 Implemented
MZ0309 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,649 $4,200 Implemented
MZ0309 # 01 Y:2021 01 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $65,174 $960 Implemented
MZ0309 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,736 $4,920 Implemented
MZ0309 # 07 Y:2021 07 2021 OPTIMIZE PLANT POWER FACTOR $354,701 $442,138 Implemented
WM0160 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $1,260 $720 Not Implemented
WM0160 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,847 $11,890 Not Implemented
WM0160 # 01 Y:2020 01 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $142,628 $60,000 Not Implemented
WM0160 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,683 $10,855 Not Implemented
WM0160 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,267 $3,450 Not Implemented
WM0160 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $261 $657 Not Implemented
WM0160 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $296 $1,631 Not Implemented
WM0160 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $10,840 $0 Not Implemented
UD1012 # 11 Y:2020 11 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $86,219 $9,464 Not Implemented
UD1012 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,706 $0 Not Implemented
UD1012 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,178 $1,000 Implemented
UD1012 # 10 Y:2020 10 2020 OPTIMIZE PLANT POWER FACTOR $145,150 $100,000 Not Implemented
UD1012 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,380 $400 Not Implemented
UD1012 # 13 Y:2020 13 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $17,175 $14,500 Not Implemented