Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
378
matching recommendationsNAICS | 311615 | Poultry Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0164 # 08 Y:2003 | 08 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,485 | $700 | Implemented |
SU0164 # 07 Y:2003 | 07 | 2003 | REDESIGN PROCESS | $6,861 | $270 | Implemented |
SU0164 # 06 Y:2003 | 06 | 2003 | INSTALL WIND POWERED ELECTRIC GENERATOR | $7,910 | $10,000 | Not Implemented |
SU0164 # 05 Y:2003 | 05 | 2003 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $8,721 | $0 | Implemented |
SU0164 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,096 | $55,580 | Implemented |
SU0164 # 03 Y:2003 | 03 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30,000 | $76,518 | Not Implemented |
SU0164 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM THICKNESS INSULATION | $115,419 | $348,540 | Implemented |
SU0164 # 01 Y:2003 | 01 | 2003 | INSTALL WIND POWERED ELECTRIC GENERATOR | $141,258 | $1,171,875 | Not Implemented |
SU0164 # 12 Y:2003 | 12 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $550 | $0 | Implemented |
SU0164 # 13 Y:2003 | 13 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $29 | Implemented |
SU0164 # 14 Y:2003 | 14 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $198 | $150 | Not Implemented |
OK0660 # 01 Y:2003 | 01 | 2003 | INSULATE BARE EQUIPMENT | $3,773 | $8,717 | Not Implemented |
OK0660 # 02 Y:2003 | 02 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,638 | $7,445 | Implemented |
OK0660 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $279 | $300 | Implemented |
OK0660 # 04 Y:2003 | 04 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,891 | $450 | Implemented |
OK0660 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $930 | $1,017 | Not Implemented |
OK0660 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $996 | $4,003 | Implemented |
OK0660 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,433 | $113,760 | Not Implemented |
OK0660 # 08 Y:2003 | 08 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,839 | $1,606 | Implemented |
OK0660 # 09 Y:2003 | 09 | 2003 | RECOVER AND REUSE COOLING WATER | $23,652 | $4,495 | Not Implemented |
OK0659 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,223 | $640 | Implemented |
OK0659 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,179 | $4,683 | Implemented |
OK0659 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $1,247 | $927 | Not Implemented |
OK0659 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $8,627 | $31,408 | Not Implemented |
OK0659 # 05 Y:2003 | 05 | 2003 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $52,195 | $19,043 | n/a |