IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

258

matching recommendations
Reset
NAICS 3117 Seafood Product Preparation and Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0053 # 09 Y:2010 09 2010 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,920 $8,875 Not Implemented
MI0184 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $60,788 $640 Implemented
MI0184 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,867 $1,500 Implemented
MI0184 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,578 $320 Implemented
MI0184 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,667 $80 Not Implemented
MI0184 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,350 $920 Implemented
LL0302 # 01 Y:2008 01 2008 AIR CONDITION ONLY SPACE NECESSARY $14,663 $30 Implemented
LL0302 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $10,611 $75,579 Not Implemented
LL0302 # 03 Y:2008 03 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,364 $450 Implemented
LL0302 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $6,658 $38,670 Not Implemented
LL0302 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $59 Not Implemented
LL0302 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $320 $240 Not Implemented
IC0132 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $906 $0 Implemented
IC0132 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,349 $3,349 Not Implemented
IC0132 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $8,296 $19,530 Implemented
IC0132 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $6,527 Not Implemented
IC0132 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71 $147 Not Implemented
IC0132 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $654 $1,962 Implemented
IC0132 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $396 $0 Implemented
IC0132 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $860 $0 Not Implemented
SF0347 # 01 Y:2007 01 2007 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $675 $819 Implemented
SF0347 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $235 $432 Not Implemented
SF0347 # 03 Y:2007 03 2007 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $7,280 $14,834 Implemented
LL0268 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $44,247 $9,812 Implemented
LL0268 # 02 Y:2007 02 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $11,560 $152 Not Implemented