IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,538

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0117 # 01 Y:2019 01 2019 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $32,085 $5,600 Not Implemented
BS0117 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $413 $1,047 Not Implemented
BS0117 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $350 Not Implemented
BS0117 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,573 $1,650 Not Implemented
BS0117 # 05 Y:2019 05 2019 ISOLATE HOT OR COLD EQUIPMENT $3,322 $502 Not Implemented
OK0988 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $7,394 $12,000 Not Implemented
OK0988 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $2,330 Not Implemented
OK0988 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,279 $15,642 Not Implemented
OK0988 # 04 Y:2018 04 2018 USE SOLAR HEAT TO HEAT WATER $4,920 $155,149 Not Implemented
SD0569 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $53,280 $265,840 Not Implemented
SD0569 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,921 $2,000 Implemented
SD0569 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,832 $13,363 Implemented
SD0569 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,555 $6,800 Not Implemented
SD0569 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $2,839 $11,100 Implemented
SU0461 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,315 $0 Not Implemented
SU0461 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,138 $700 Implemented
SU0461 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $910 $651 Not Implemented
SU0461 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $397 Implemented
SU0461 # 05 Y:2018 05 2018 REPLACE BOILER $10,937 $22,000 Not Implemented
SU0461 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $27,679 Implemented
SU0461 # 07 Y:2018 07 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $315 $955 Implemented
TR0008 # 06 Y:2018 06 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,464 $0 Not Implemented
TR0008 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,536 $3,860 Implemented
TR0008 # 02 Y:2018 02 2018 INSULATE BARE EQUIPMENT $692 $602 Not Implemented
TR0008 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,264 $975 Implemented