Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
145
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0527 # 03 Y:2019 | 03 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,597 | $6,350 | Not Implemented |
UF0527 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,462 | $7,500 | Not Implemented |
UF0527 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,160 | $456 | Implemented |
UF0527 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $1,039 | $1,393 | Implemented |
UF0527 # 07 Y:2019 | 07 | 2019 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $24,935 | $1,665 | Implemented |
UF0526 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $727,193 | $3,000,000 | Implemented |
UF0526 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $95,677 | $50,000 | Implemented |
UF0526 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $75,075 | $4,000 | Implemented |
UF0526 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,403 | $0 | Implemented |
UF0526 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,088 | $496 | Implemented |
UF0526 # 06 Y:2019 | 06 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,132 | $9,341 | Implemented |
UF0526 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,738 | $13,541 | Implemented |
UF0515 # 01 Y:2018 | 01 | 2018 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $293,173 | $1,270,000 | Not Implemented |
UF0515 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,829 | $63,355 | Implemented |
UF0515 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,104 | $23,300 | Implemented |
UF0515 # 04 Y:2018 | 04 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $11,421 | $29,224 | Implemented |
UF0515 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,553 | $2,800 | Implemented |
UF0515 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,453 | $512 | Implemented |
MI0309 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $16,370 | $1,640 | Implemented |
MI0309 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $13,394 | $34,000 | Implemented |
MI0309 # 03 Y:2017 | 03 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,478 | $320 | Implemented |
MI0309 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $4,544 | $1,640 | Implemented |
MI0309 # 05 Y:2017 | 05 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,389 | $1,729 | Implemented |
MI0309 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,090 | $1,882 | Implemented |
MI0309 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,772 | $6,223 | Implemented |