Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,542
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0140 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,305 | $98,895 | Not Implemented |
DL0140 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $3,810 | $1,640 | Not Implemented |
DL0140 # 06 Y:2015 | 06 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,660 | $74,190 | Not Implemented |
MI0274 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,151 | $1,660 | Implemented |
MI0274 # 02 Y:2015 | 02 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,336 | $140 | Implemented |
MI0274 # 03 Y:2015 | 03 | 2015 | BURN A LESS EXPENSIVE GRADE OF FUEL | $10,584 | $14,880 | Not Implemented |
MI0274 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,327 | $4,691 | Implemented |
MI0274 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,833 | $11,640 | Implemented |
MI0274 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,565 | $40 | Implemented |
MI0274 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,430 | $1,710 | Implemented |
MI0274 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,100 | $639 | Implemented |
MI0274 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,582 | $6,871 | Implemented |
MI0274 # 10 Y:2015 | 10 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,145 | $780 | Implemented |
MI0274 # 11 Y:2015 | 11 | 2015 | USE OPTIMUM THICKNESS INSULATION | $626 | $360 | Implemented |
MI0274 # 12 Y:2015 | 12 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $457 | $160 | Implemented |
MI0274 # 13 Y:2015 | 13 | 2015 | INSULATE BARE EQUIPMENT | $320 | $310 | Not Implemented |
MI0274 # 14 Y:2015 | 14 | 2015 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $253 | $320 | Implemented |
OR0641 # 01 Y:2014 | 01 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,076 | $2,794 | Implemented |
OR0641 # 02 Y:2014 | 02 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,580 | $8,760 | Implemented |
OR0641 # 03 Y:2014 | 03 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,509 | $8,500 | Not Implemented |
OR0641 # 04 Y:2014 | 04 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,470 | $1,577 | Implemented |
OR0641 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $581 | $1,121 | Implemented |
AM0668 # 01 Y:2014 | 01 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,700 | $3,340 | Not Implemented |
AM0668 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,250 | $2,500 | Implemented |
AM0668 # 03 Y:2014 | 03 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,840 | $33,524 | Implemented |