Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
121
matching recommendationsNAICS | 31181 | Bread and Bakery Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0574 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,896 | $25,258 | Implemented |
UF0574 # 06 Y:2022 | 06 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $5,512 | $600 | Implemented |
UF0574 # 07 Y:2022 | 07 | 2022 | OPTIMIZE PLANT POWER FACTOR | $5,422 | $24,763 | Implemented |
UF0574 # 08 Y:2022 | 08 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,103 | $14,366 | Not Implemented |
UF0574 # 09 Y:2022 | 09 | 2022 | INSTALL TURBULATORS | $2,101 | $7,500 | Not Implemented |
UF0574 # 10 Y:2022 | 10 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,498 | $7,375 | Not Implemented |
UF0574 # 11 Y:2022 | 11 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $287,926 | $0 | Implemented |
UF0574 # 12 Y:2022 | 12 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $22,157 | $0 | Implemented |
UF0574 # 13 Y:2022 | 13 | 2022 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $16,503 | $80,000 | Implemented |
UF0574 # 14 Y:2022 | 14 | 2022 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $18,108 | $45,538 | Implemented |
UF0574 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,484 | $20,340 | Implemented |
UF0574 # 03 Y:2022 | 03 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $22,318 | $12,420 | Implemented |
UF0574 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,315 | $45,847 | Implemented |
UF0574 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,729 | $322,608 | Implemented |
UF0527 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,160 | $456 | Implemented |
UF0527 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,537 | $24,798 | Implemented |
UF0527 # 03 Y:2019 | 03 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,597 | $6,350 | Not Implemented |
UF0527 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $1,039 | $1,393 | Implemented |
UF0527 # 07 Y:2019 | 07 | 2019 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $24,935 | $1,665 | Implemented |
UF0527 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,268 | $21,268 | Implemented |
UF0527 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,462 | $7,500 | Not Implemented |
UF0526 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $727,193 | $3,000,000 | Implemented |
UF0526 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,088 | $496 | Implemented |
UF0526 # 06 Y:2019 | 06 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,132 | $9,341 | Implemented |
UF0526 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,738 | $13,541 | Implemented |