IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0574 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,896 $25,258 Implemented
UF0574 # 06 Y:2022 06 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,512 $600 Implemented
UF0574 # 07 Y:2022 07 2022 OPTIMIZE PLANT POWER FACTOR $5,422 $24,763 Implemented
UF0574 # 08 Y:2022 08 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,103 $14,366 Not Implemented
UF0574 # 09 Y:2022 09 2022 INSTALL TURBULATORS $2,101 $7,500 Not Implemented
UF0574 # 10 Y:2022 10 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,498 $7,375 Not Implemented
UF0574 # 11 Y:2022 11 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $287,926 $0 Implemented
UF0574 # 12 Y:2022 12 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $22,157 $0 Implemented
UF0574 # 13 Y:2022 13 2022 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $16,503 $80,000 Implemented
UF0574 # 14 Y:2022 14 2022 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $18,108 $45,538 Implemented
UF0574 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,484 $20,340 Implemented
UF0574 # 03 Y:2022 03 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,318 $12,420 Implemented
UF0574 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,315 $45,847 Implemented
UF0574 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $57,729 $322,608 Implemented
UF0527 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $456 Implemented
UF0527 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,537 $24,798 Implemented
UF0527 # 03 Y:2019 03 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,597 $6,350 Not Implemented
UF0527 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,039 $1,393 Implemented
UF0527 # 07 Y:2019 07 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $24,935 $1,665 Implemented
UF0527 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,268 $21,268 Implemented
UF0527 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,462 $7,500 Not Implemented
UF0526 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $727,193 $3,000,000 Implemented
UF0526 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,088 $496 Implemented
UF0526 # 06 Y:2019 06 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,132 $9,341 Implemented
UF0526 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,738 $13,541 Implemented