IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0500 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $257 $508 Not Implemented
SU0500 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $285 $0 Not Implemented
SU0500 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,087 $14,773 Implemented
SU0500 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $682 $785 Not Implemented
SU0500 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,803 $0 Not Implemented
SU0500 # 04 Y:2020 04 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $327 $294 Not Implemented
SU0500 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $11,303 $3,012 Not Implemented
SU0461 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $27,679 Implemented
SU0461 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $397 Implemented
SU0461 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,315 $0 Not Implemented
SU0461 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,138 $700 Implemented
SU0461 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $910 $651 Not Implemented
SU0461 # 05 Y:2018 05 2018 REPLACE BOILER $10,937 $22,000 Not Implemented
SU0461 # 07 Y:2018 07 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $315 $955 Implemented
SU0385 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,452 $1,124 Implemented
SU0385 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $1,010 Implemented
SU0385 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $78,891 $97,500 Implemented
SU0385 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $1,060 Implemented
SU0385 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $2,578 $370 Implemented
SU0385 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,387 $210 Not Implemented
SU0385 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,815 $0 Implemented
SU0225 # 11 Y:2006 11 2006 OPTIMIZE PLANT POWER FACTOR $9,250 $12,757 Implemented
SU0225 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $653 Implemented
SU0225 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,994 $1,058 Implemented
SU0225 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $23,287 $1,708 Implemented