IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0117 # 05 Y:2019 05 2019 ISOLATE HOT OR COLD EQUIPMENT $3,322 $502 Not Implemented
BS0117 # 01 Y:2019 01 2019 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $32,085 $5,600 Not Implemented
BS0117 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $413 $1,047 Not Implemented
BS0117 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $350 Not Implemented
BS0117 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,573 $1,650 Not Implemented
BS0068 # 05 Y:2015 05 2015 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $12,480 $11,240 Not Implemented
BS0068 # 02 Y:2015 02 2015 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,272 $5,853 Not Implemented
BS0068 # 03 Y:2015 03 2015 AIR CONDITION ONLY SPACE NECESSARY $1,060 $4,455 Not Implemented
BS0068 # 04 Y:2015 04 2015 USE OPTIMUM THICKNESS INSULATION $29 $100 Not Implemented
BS0068 # 01 Y:2015 01 2015 USE OPTIMUM THICKNESS INSULATION $70 $51 Not Implemented
OR0613 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,040 $2,913 Not Implemented
OR0613 # 01 Y:2013 01 2013 REUSE / RECYCLE/ SELL PAPER PRODUCTS $11,140 $5,000 Implemented
OR0613 # 07 Y:2013 07 2013 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $706 $448 Implemented
OR0613 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,262 $36,000 Implemented
OR0613 # 04 Y:2013 04 2013 RECOVER AND REUSE WASTE MATERIAL $3,635 $8,000 Not Implemented
OR0613 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,364 $17,632 Not Implemented
OR0613 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $991 $95 Implemented
UW0021 # 02 Y:2008 02 2008 OPERATE BOILERS ON HIGH FIRE SETTING $20,223 $49,000 Not Implemented
UW0021 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $478 $450 Not Implemented
UW0021 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,472 $0 Not Implemented
UW0021 # 04 Y:2008 04 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,612 $50,000 Not Implemented
UW0021 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,357 $5,912 Not Implemented
UW0021 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $52,486 $175,000 Not Implemented
OR0511 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $7,340 Not Implemented
OR0511 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $35,500 $8,000 Implemented