Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsNAICS | 31181 | Bread and Bakery Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0117 # 05 Y:2019 | 05 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $3,322 | $502 | Not Implemented |
BS0117 # 01 Y:2019 | 01 | 2019 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $32,085 | $5,600 | Not Implemented |
BS0117 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $413 | $1,047 | Not Implemented |
BS0117 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,373 | $350 | Not Implemented |
BS0117 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,573 | $1,650 | Not Implemented |
BS0068 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,480 | $11,240 | Not Implemented |
BS0068 # 02 Y:2015 | 02 | 2015 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,272 | $5,853 | Not Implemented |
BS0068 # 03 Y:2015 | 03 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $1,060 | $4,455 | Not Implemented |
BS0068 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM THICKNESS INSULATION | $29 | $100 | Not Implemented |
BS0068 # 01 Y:2015 | 01 | 2015 | USE OPTIMUM THICKNESS INSULATION | $70 | $51 | Not Implemented |
OR0613 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $3,040 | $2,913 | Not Implemented |
OR0613 # 01 Y:2013 | 01 | 2013 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $11,140 | $5,000 | Implemented |
OR0613 # 07 Y:2013 | 07 | 2013 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $706 | $448 | Implemented |
OR0613 # 03 Y:2013 | 03 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,262 | $36,000 | Implemented |
OR0613 # 04 Y:2013 | 04 | 2013 | RECOVER AND REUSE WASTE MATERIAL | $3,635 | $8,000 | Not Implemented |
OR0613 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,364 | $17,632 | Not Implemented |
OR0613 # 06 Y:2013 | 06 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $991 | $95 | Implemented |
UW0021 # 02 Y:2008 | 02 | 2008 | OPERATE BOILERS ON HIGH FIRE SETTING | $20,223 | $49,000 | Not Implemented |
UW0021 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $478 | $450 | Not Implemented |
UW0021 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,472 | $0 | Not Implemented |
UW0021 # 04 Y:2008 | 04 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,612 | $50,000 | Not Implemented |
UW0021 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,357 | $5,912 | Not Implemented |
UW0021 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $52,486 | $175,000 | Not Implemented |
OR0511 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,500 | $7,340 | Not Implemented |
OR0511 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $35,500 | $8,000 | Implemented |