IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

462

matching recommendations
Reset
NAICS 311812 Commercial Bakeries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0018 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $13,848 $6,050 Implemented
UA0018 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $5,592 $840 Implemented
UA0018 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,000 $1,000 Implemented
TT0021 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $3,500 $12,500 Implemented
TT0021 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $520 $1,700 Implemented
TT0021 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,829 $15,912 Implemented
TT0021 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,829 $15,912 Implemented
TT0021 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,957 $11,633 Implemented
TT0021 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $947 $3,646 Implemented
TT0021 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $1,243 Implemented
TT0021 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $1,641 Implemented
TT0021 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $702 $263 Implemented
SF0343 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,112 $220 Implemented
SF0343 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $6,925 $6,063 Implemented
SF0343 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $364 Implemented
SF0343 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,009 $9,569 Implemented
AM0529 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $41,500 $86,400 Implemented
AM0529 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,110 $2,165 Implemented
AM0529 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,160 $360 Implemented
AM0529 # 08 Y:2007 08 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $968 $0 Implemented
OR0511 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,200,000 $400,000 Implemented
OR0511 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $35,500 $8,000 Implemented
OR0511 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $14,400 $13,700 Implemented
OR0511 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,800 $0 Implemented
OR0511 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,300 Implemented