IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,036

matching recommendations
Reset
NAICS 311812 Commercial Bakeries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0391 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $6,982 $2,372 Implemented
LE0391 # 05 Y:2015 05 2015 USE RADIANT HEATER FOR SPOT HEATING $30,168 $12,000 Not Implemented
LE0391 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,773 $1,000 Not Implemented
LE0391 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $109 $75 Implemented
LE0391 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,985 $49,800 Not Implemented
LE0391 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,081 $30,500 Not Implemented
LE0391 # 10 Y:2015 10 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $119,994 $200,000 Not Implemented
LE0391 # 11 Y:2015 11 2015 UPGRADE OBSOLETE EQUIPMENT $17,674 $30,425 Not Implemented
LE0391 # 12 Y:2015 12 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,982 $7,500 Implemented
LE0391 # 13 Y:2015 13 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,886 $29,120 Not Implemented
LE0391 # 14 Y:2015 14 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,842 $31,282 Not Implemented
LE0391 # 15 Y:2015 15 2015 OPTIMIZE PLANT POWER FACTOR $28 $145 Not Implemented
MZ0176 # 01 Y:2015 01 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,279 $0 Not Implemented
MZ0176 # 02 Y:2015 02 2015 UPGRADE CONTROLS ON COMPRESSORS $22,758 $100,000 Not Implemented
MZ0176 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,004 $6,500 Not Implemented
MZ0176 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,923 $1,000 Not Implemented
MZ0176 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,037 $1,560 Not Implemented
MZ0176 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,569 $115,650 Not Implemented
MZ0176 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $30,675 $7,500 Not Implemented
MZ0176 # 08 Y:2015 08 2015 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $2,330 $3,500 Not Implemented
MZ0176 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,580 $9,500 Not Implemented
OK0912 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,007 $1,150 Implemented
OK0912 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,191 $8,250 Implemented
OK0912 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $699 $1,752 Implemented
OK0912 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $710 $806 Not Implemented