Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 311812 | Commercial Bakeries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0267 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $677 | $901 | Implemented |
UA0267 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,388 | $1,682 | Not Implemented |
UA0267 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,954 | $1,360 | Implemented |
UA0267 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,033 | $1,000 | Implemented |
UA0267 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $13,660 | $51,749 | Not Implemented |
UA0266 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $894 | $558 | Not Implemented |
UA0266 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,871 | $22,132 | Not Implemented |
UA0266 # 04 Y:2022 | 04 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,089 | $188 | Not Implemented |
UA0266 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,950 | $865 | Not Implemented |
UA0266 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,514 | $8,397 | Not Implemented |
UA0266 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,219 | $1,000 | Not Implemented |
UA0265 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $14,987 | $4,205 | Not Implemented |
UA0265 # 05 Y:2022 | 05 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,503 | $34,984 | Not Implemented |
UA0265 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,413 | $5,533 | Not Implemented |
UA0265 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,737 | $23,601 | Not Implemented |
UA0265 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,134 | $400 | Not Implemented |
UA0018 # 01 Y:2008 | 01 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $28,103 | $15,000 | Not Implemented |
UA0018 # 11 Y:2008 | 11 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,404 | $30,900 | Not Implemented |
UA0018 # 10 Y:2008 | 10 | 2008 | INSTALL AUTOMATIC STACK DAMPER | $78,268 | $3,900 | Not Implemented |
UA0018 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,739 | $10,237 | Not Implemented |
UA0018 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,582 | $71,934 | Not Implemented |
UA0018 # 07 Y:2008 | 07 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,000 | $1,000 | Implemented |
UA0018 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $5,592 | $840 | Implemented |
UA0018 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,848 | $6,050 | Implemented |
UA0018 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,032 | $15,500 | Not Implemented |