Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 311813 Frozen Cakes, Pies, and Other Pastries Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0461 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $397 Implemented
SU0461 # 07 Y:2018 07 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $315 $955 Implemented
SU0461 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,138 $700 Implemented
SU0461 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $27,679 Implemented
MZ0156 # 08 Y:2014 08 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,299 $10,282 Implemented
MZ0156 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,514 $141,366 Implemented
MZ0156 # 05 Y:2014 05 2014 USE OPTIMUM THICKNESS INSULATION $9,068 $30,128 Implemented
MZ0156 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,886 $4,400 Implemented
MZ0156 # 03 Y:2014 03 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,460 $400 Implemented
MZ0156 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,480 $2,000 Implemented
MZ0156 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,514 $71,320 Implemented
OK0866 # 05 Y:2013 05 2013 INSTALL SET-BACK TIMERS $449 $318 Implemented
OK0866 # 04 Y:2013 04 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,776 $1,440 Implemented
OK0866 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $1,077 $16,000 Implemented
OK0866 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $232 $280 Implemented
SF0342 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,677 $54,912 Implemented
SF0342 # 07 Y:2007 07 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,176 $22,780 Implemented
SF0342 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,746 $7,500 Implemented
SD0385 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,090 $17,767 Implemented
MA0603 # 15 Y:2006 15 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $874 $4,000 Implemented
MA0603 # 14 Y:2006 14 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,402 $0 Implemented
MA0603 # 11 Y:2006 11 2006 BURN WASTE OIL FOR HEAT $3,685 $6,500 Implemented
MA0603 # 10 Y:2006 10 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,287 $0 Implemented
MA0603 # 08 Y:2006 08 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,480 $50,000 Implemented
MA0603 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,595 $83,500 Implemented