Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 31182 | Cookie, Cracker, and Pasta Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0302 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $320 | $0 | n/a |
IC0302 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,025 | $350 | n/a |
IC0302 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,613 | $0 | n/a |
IC0302 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $376 | $0 | n/a |
IC0302 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $411 | $0 | n/a |
IC0302 # 10 Y:2024 | 10 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,478 | $12,801 | n/a |
IC0302 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $1,256 | n/a |
IC0302 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,001 | $2,566 | n/a |
IC0302 # 09 Y:2024 | 09 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,215 | $4,414 | n/a |
IC0302 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,385 | $1,118 | n/a |
IC0247 # 02 Y:2021 | 02 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,646 | $64,258 | Implemented |
IC0247 # 07 Y:2021 | 07 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,269 | $24,850 | Not Implemented |
IC0247 # 06 Y:2021 | 06 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $283 | $578 | Not Implemented |
IC0247 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,246 | $207 | Not Implemented |
IC0247 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,040 | $5,000 | Implemented |
IC0247 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,752 | $1,964 | Not Implemented |
IC0247 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,735 | $1,539 | Implemented |
IC0156 # 01 Y:2009 | 01 | 2009 | ADD AREA LIGHTING SWITCHES | $10,860 | $8,096 | Implemented |
IC0156 # 11 Y:2009 | 11 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,559 | $2,887 | Implemented |
IC0156 # 09 Y:2009 | 09 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,278 | $7,995 | Not Implemented |
IC0156 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,513 | $1,610 | Not Implemented |
IC0156 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,309 | $5,917 | Implemented |
IC0156 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,483 | $29,250 | Implemented |
IC0156 # 04 Y:2009 | 04 | 2009 | DISCONNECT BALLASTS | $2,089 | $2,200 | Implemented |
IC0156 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,116 | $1,649 | Implemented |