Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 31182 | Cookie, Cracker, and Pasta Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0075 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $980 | $4,500 | Not Implemented |
UU0075 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,270 | $1,000 | Implemented |
UU0075 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,700 | $8,000 | Not Implemented |
UU0075 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,540 | $8,000 | Not Implemented |
UU0075 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,590 | $1,320 | Implemented |
UU0075 # 01 Y:2004 | 01 | 2004 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $400 | $250 | Not Implemented |
UU0075 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,120 | $150 | Implemented |
WV0301 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,925 | $120 | Implemented |
WV0301 # 07 Y:2004 | 07 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $3,558 | $1,000 | Implemented |
WV0301 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,898 | $780 | Not Implemented |
WV0301 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,088 | $1,890 | Implemented |
WV0301 # 09 Y:2004 | 09 | 2004 | BURN WASTE OIL FOR HEAT | $1,799 | $3,800 | Not Implemented |
WV0301 # 10 Y:2004 | 10 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,362 | $175 | Implemented |
WV0301 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,293 | $0 | Implemented |
WV0301 # 12 Y:2004 | 12 | 2004 | INSULATE BARE EQUIPMENT | $317 | $117 | Not Implemented |
WV0301 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $30,817 | $4,062 | Implemented |
WV0301 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,918 | $4,120 | Implemented |
WV0301 # 04 Y:2004 | 04 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $6,476 | $360 | Implemented |
WV0301 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,529 | $14,877 | Implemented |
LM0082 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $123 | $169 | n/a |
LM0082 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $856 | $0 | n/a |
LM0082 # 04 Y:2004 | 04 | 2004 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $13,000 | $5,400 | n/a |
LM0082 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $474 | $65 | n/a |
LM0082 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $13,838 | $26,170 | n/a |
MA0552 # 08 Y:2004 | 08 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $428 | $18,000 | Not Implemented |