IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

189

matching recommendations
Reset
NAICS 311821 Cookie and Cracker Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0413 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,019 $1,523 n/a
MS0413 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $35,830 $456,750 n/a
IC0247 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,246 $207 Not Implemented
IC0247 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,269 $24,850 Not Implemented
IC0247 # 06 Y:2021 06 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $283 $578 Not Implemented
IC0247 # 02 Y:2021 02 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,646 $64,258 Implemented
IC0247 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,040 $5,000 Implemented
IC0247 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,752 $1,964 Not Implemented
IC0247 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $1,539 Implemented
MZ0277 # 07 Y:2019 07 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $70,665 $233,814 Implemented
MZ0277 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,416 $4,211 Implemented
MZ0277 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,719 $50,000 Not Implemented
MZ0277 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,394 $440 Not Implemented
MZ0277 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,650 $2,700 Implemented
MZ0277 # 05 Y:2019 05 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $8,418 $1,920 Not Implemented
MZ0277 # 09 Y:2019 09 2019 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $409 $1,200 Implemented
MZ0277 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,816 $3,021 Implemented
MZ0277 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $55,889 $160 Implemented
LS1806 # 04 Y:2018 04 2018 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $1,519 $6,300 Not Implemented
LS1806 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,834 $13,581 Not Implemented
LS1806 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11 $9 Not Implemented
LS1806 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $168 $100 Not Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented
UF0515 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,553 $2,800 Implemented
UF0515 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,453 $512 Implemented