IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

196

matching recommendations
Reset
NAICS 311821 Cookie and Cracker Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1806 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11 $9 Not Implemented
LS1806 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $168 $100 Not Implemented
LS1806 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,834 $13,581 Not Implemented
LS1806 # 04 Y:2018 04 2018 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $1,519 $6,300 Not Implemented
UF0515 # 04 Y:2018 04 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,421 $29,224 Implemented
UF0515 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,104 $23,300 Implemented
UF0515 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,553 $2,800 Implemented
UF0515 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $293,173 $1,270,000 Not Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented
UF0515 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,453 $512 Implemented
UK1505 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,753 $3,800 Implemented
UK1505 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,028 $1,750 Implemented
UK1505 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,107 $266 Implemented
UK1505 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,528 $4,500 Implemented
UK1505 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,998 $0 Implemented
UK1505 # 11 Y:2015 11 2015 REPAIR AND ELIMINATE STEAM LEAKS $2,571 $5,110 Implemented
UK1505 # 06 Y:2015 06 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $1,747 $635 Implemented
UK1505 # 10 Y:2015 10 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $548 $276 Implemented
UK1505 # 09 Y:2015 09 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $3,562 $3,824 Implemented
UK1505 # 08 Y:2015 08 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $54,447 $42,474 Not Implemented
UK1505 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $296 $61 Implemented
UK1406 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $7,546 $34,475 Not Implemented
UK1406 # 08 Y:2014 08 2014 ADD AREA LIGHTING SWITCHES $1,572 $620 Implemented
UK1406 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,190 $0 Implemented
UK1406 # 02 Y:2014 02 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $20,868 $60,000 Implemented