IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 311830 Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0008 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,128 Implemented
TR0008 # 04 Y:2018 04 2018 MAINTAIN MACHINES TO REDUCE LEAKS $13,889 $1,000 Implemented
TR0008 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,536 $3,860 Implemented
TR0008 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,264 $975 Implemented
AM0737 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,800 $35,500 Implemented
AM0737 # 02 Y:2017 02 2017 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $18,400 $0 Implemented
AM0737 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $710 Implemented
AM0737 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $3,600 Implemented
AM0737 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $2,000 Implemented
SU0443 # 01 Y:2017 01 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,819 $0 Implemented
SU0443 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $178 $426 Implemented
SU0443 # 10 Y:2017 10 2017 UPGRADE OBSOLETE EQUIPMENT $86 $243 Implemented
SU0443 # 04 Y:2017 04 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $4,829 $2,540 Implemented
SU0443 # 02 Y:2017 02 2017 DISCONNECT BALLASTS $425 $0 Implemented
SU0443 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,477 $665 Implemented
MI0309 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $16,370 $1,640 Implemented
MI0309 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $13,394 $34,000 Implemented
MI0309 # 03 Y:2017 03 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,478 $320 Implemented
MI0309 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $4,544 $1,640 Implemented
MI0309 # 05 Y:2017 05 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,389 $1,729 Implemented
MI0309 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,090 $1,882 Implemented
MI0309 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,772 $6,223 Implemented
MI0309 # 08 Y:2017 08 2017 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $649 $210 Implemented
MI0309 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $307 $1,591 Implemented
CO0691 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,050 $440 Implemented