Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
752
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0855 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $1,127 | $1,120 | Implemented |
GT0855 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $795 | $500 | Implemented |
SF0364 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,446 | $0 | Implemented |
SF0364 # 02 Y:2008 | 02 | 2008 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $4,812 | $1,046 | Implemented |
SF0364 # 03 Y:2008 | 03 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,974 | $913 | Implemented |
SF0364 # 04 Y:2008 | 04 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,655 | $798 | Implemented |
SF0364 # 06 Y:2008 | 06 | 2008 | BURN A LESS EXPENSIVE GRADE OF FUEL | $85,730 | $61,250 | Implemented |
SF0364 # 09 Y:2008 | 09 | 2008 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $9,060 | $11,740 | Implemented |
SF0364 # 10 Y:2008 | 10 | 2008 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,734 | $8,900 | Implemented |
SF0364 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $409 | $801 | Implemented |
SF0364 # 12 Y:2008 | 12 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,909 | $2,854 | Implemented |
SF0364 # 13 Y:2008 | 13 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,296 | $2,489 | Implemented |
SF0364 # 14 Y:2008 | 14 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $63,306 | $125,074 | Implemented |
SF0364 # 15 Y:2008 | 15 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,376 | $28,462 | Implemented |
SF0364 # 16 Y:2008 | 16 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,581 | $35,138 | Implemented |
SD0409 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,066 | $6,344 | Implemented |
SD0409 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,423 | $6,590 | Implemented |
SD0409 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,387 | $2,539 | Implemented |
SD0409 # 06 Y:2008 | 06 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,067 | $183 | Implemented |
SU0272 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,466 | $0 | Implemented |
SU0272 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,013 | $0 | Implemented |
SU0272 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,164 | $173 | Implemented |
SU0272 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $2,414 | $535 | Implemented |
SU0272 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,418 | $1,650 | Implemented |
SU0272 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,762 | $31,086 | Implemented |