IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2413 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $68,225 $155,400 Implemented
LS2413 # 02 Y:2024 02 2024 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,076 $16,000 Implemented
LS2412 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $872 $135 Implemented
LS2412 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,854 $5,915 Implemented
LS2411 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $45 Implemented
LS2411 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,962 $12,050 Implemented
LS2411 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,136 $480,000 Implemented
LT8400 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,040 $26,888 Implemented
LS2402 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,573 $125 Implemented
LS2402 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $5,000 $12,500 Implemented
LS2402 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $35,595 $0 Implemented
LT8373 # 05 Y:2023 05 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $24,164 $0 Implemented
LT8373 # 06 Y:2023 06 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $22,998 $53,560 Implemented
LT8373 # 04 Y:2023 04 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $96,000 $0 Implemented
LS2302 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $2,984 $325 Implemented
LS2302 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,803 $19,030 Implemented
LT8368 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $585 $852 Implemented
LS2219 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $389 $225 Implemented
LS2219 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $676 $1,121 Implemented
LS1903 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $135 $0 Implemented
LS1903 # 03 Y:2019 03 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $839 $0 Implemented
LS1903 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $45 $0 Implemented
LL0323 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,211 $8,680 Implemented
LL0316 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,707 $1,980 Implemented
LL0316 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,047 $30 Implemented