Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,762
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8368 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $952 | $3,400 | Not Implemented |
LT8368 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $585 | $852 | Implemented |
UW2207 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,631 | $2,080 | Implemented |
UW2207 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,582 | $12,124 | Not Implemented |
UW2207 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $685 | $112 | Implemented |
UW2207 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,161 | $0 | Implemented |
UF0585 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,858 | $44,939 | Implemented |
UF0585 # 02 Y:2022 | 02 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $11,758 | $1,342 | Implemented |
UF0585 # 03 Y:2022 | 03 | 2022 | INSTALL TURBULATORS | $6,811 | $7,500 | Implemented |
UF0585 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,918 | $756 | Implemented |
UF0585 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,345 | $0 | Implemented |
UF0585 # 06 Y:2022 | 06 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $45,977 | $0 | Implemented |
UF0585 # 07 Y:2022 | 07 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $19,210 | $10,000 | Implemented |
UF0585 # 08 Y:2022 | 08 | 2022 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,436 | $448 | Not Implemented |
TT0282 # 01 Y:2022 | 01 | 2022 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $816,618 | $2,873,364 | Implemented |
TT0282 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $360,908 | $51,360 | Implemented |
TT0282 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $99,184 | $280,000 | Not Implemented |
TT0282 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,725 | $152,000 | Implemented |
TT0282 # 05 Y:2022 | 05 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $42,363 | $21,260 | Implemented |
TT0282 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,290 | $58,960 | Implemented |
TT0282 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,200 | $15,000 | Implemented |
TT0282 # 08 Y:2022 | 08 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $542 | $1,120 | Not Implemented |
MI0410 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,438 | $580 | Implemented |
MI0410 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,151 | $7,280 | Implemented |
MI0410 # 03 Y:2022 | 03 | 2022 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $5,890 | $80 | Not Implemented |