Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0446 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,963 | $2,500 | Implemented |
WV0446 # 09 Y:2012 | 09 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $6,712 | $5,683 | Implemented |
WV0446 # 10 Y:2012 | 10 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,393 | $423 | Not Implemented |
WV0446 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $3,610 | $4,438 | Implemented |
WV0446 # 15 Y:2012 | 15 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,151 | $70 | Implemented |
WV0446 # 13 Y:2012 | 13 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,788 | $1,351 | Not Implemented |
WV0446 # 14 Y:2012 | 14 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,403 | $5,700 | Not Implemented |
WV0446 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,208 | $21,000 | Not Implemented |
WV0446 # 02 Y:2012 | 02 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,144 | $70,000 | Not Implemented |
WV0446 # 01 Y:2012 | 01 | 2012 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $147,469 | $548,000 | Not Implemented |
WV0446 # 16 Y:2012 | 16 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,334 | $1,625 | Not Implemented |
WV0446 # 17 Y:2012 | 17 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,153 | $475 | Implemented |
DL0066 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,960 | $1,035 | Implemented |
DL0066 # 02 Y:2011 | 02 | 2011 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $101,455 | $36,300 | Not Implemented |
DL0066 # 03 Y:2011 | 03 | 2011 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,460 | $2,000 | Implemented |
DL0066 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,015 | $4,000 | Implemented |
DL0066 # 07 Y:2011 | 07 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,163 | $3,750 | Not Implemented |
DL0066 # 06 Y:2011 | 06 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $12,600 | $10,000 | Not Implemented |
DL0066 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,701 | $1,257 | Not Implemented |
DL0029 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,326 | $4,000 | Implemented |
DL0029 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,700 | $3,250 | Not Implemented |
DL0029 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,724 | $75,600 | Not Implemented |
DL0029 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $44,793 | $11,000 | Implemented |
DL0029 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,200 | $500 | Not Implemented |
WV0328 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $646 | $278 | Implemented |