IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0655 # 05 Y:2015 05 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $15,571 $19,050 Not Implemented
OR0655 # 04 Y:2015 04 2015 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $175,008 $188,400 Not Implemented
OR0655 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $20,211 $1,000 Not Implemented
OR0655 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,161 $1,000 Implemented
OR0655 # 01 Y:2015 01 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,151 $0 Not Implemented
BS0020 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $18,318 $19,262 Implemented
BS0020 # 01 Y:2013 01 2013 REDESIGN PROCESS $15,024 $15,359 Not Implemented
BS0020 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,893 $71,307 Implemented
BS0020 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,831 $15,600 Implemented
BS0020 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $9,887 $5,300 Implemented
BS0020 # 06 Y:2013 06 2013 COVER OPEN TANKS $3,845 $6,050 Not Implemented
OR0596 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $48,291 $10,000 Implemented
OR0596 # 01 Y:2012 01 2012 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,782 $7,200 Not Implemented
OR0596 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $7,460 Not Implemented
OR0596 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,779 $2,217 Implemented
OR0596 # 04 Y:2012 04 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,274 $46,450 Not Implemented
OR0596 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,326 $6,711 Not Implemented
OR0596 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $80,359 $51,328 Not Implemented
OR0484 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $847 $1,013 Implemented
OR0484 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,710 $400 Not Implemented
OR0484 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $41,089 $40,143 Not Implemented
OR0483 # 07 Y:2005 07 2005 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $5,131 $15,000 Not Implemented
OR0483 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,390 $72,000 Implemented
OR0483 # 05 Y:2005 05 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,000 $69,000 Implemented
OR0483 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,960 $3,000 Implemented