Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,762
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0216 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $320 | Not Implemented |
LE0216 # 05 Y:2005 | 05 | 2005 | USE SYNTHETIC LUBRICANT | $429 | $200 | Not Implemented |
LE0216 # 06 Y:2005 | 06 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,078 | $110 | Not Implemented |
LE0216 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,315 | $40,077 | Not Implemented |
OR0484 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $41,089 | $40,143 | Not Implemented |
OR0484 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,710 | $400 | Not Implemented |
OR0484 # 03 Y:2005 | 03 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $847 | $1,013 | Implemented |
UF0362 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,108 | $706 | Not Implemented |
UF0362 # 02 Y:2005 | 02 | 2005 | INSTALL OCCUPANCY SENSORS | $5,310 | $2,525 | Not Implemented |
UF0362 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,498 | $0 | Not Implemented |
UF0362 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $767 | $0 | Not Implemented |
UF0362 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $245 | $324 | Not Implemented |
UF0362 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,793 | $16,078 | Not Implemented |
UF0362 # 07 Y:2005 | 07 | 2005 | ADD AREA LIGHTING SWITCHES | $357 | $3,655 | Not Implemented |
UF0362 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $288 | $245 | Not Implemented |
UF0362 # 09 Y:2005 | 09 | 2005 | INSULATE BARE EQUIPMENT | $1,276 | $168 | Not Implemented |
UF0362 # 10 Y:2005 | 10 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $8,012 | $0 | Not Implemented |
UF0362 # 11 Y:2005 | 11 | 2005 | RECYCLE FLUORESCENT LAMPS | $355 | $3,496 | Not Implemented |
OR0483 # 01 Y:2005 | 01 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $21,624 | $0 | Implemented |
OR0483 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $24,290 | $4,400 | Implemented |
OR0483 # 03 Y:2005 | 03 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $5,100 | Implemented |
OR0483 # 04 Y:2005 | 04 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $8,960 | $3,000 | Implemented |
OR0483 # 05 Y:2005 | 05 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,000 | $69,000 | Implemented |
OR0483 # 06 Y:2005 | 06 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $40,390 | $72,000 | Implemented |
OR0483 # 07 Y:2005 | 07 | 2005 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $5,131 | $15,000 | Not Implemented |