IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0782 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,302 $41,745 Implemented
OR0782 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,455 $3,143 Implemented
OR0782 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $34,701 $316,866 Not Implemented
OR0749 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $999 $0 Implemented
OR0749 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $43,522 $28,094 Not Implemented
OR0749 # 03 Y:2022 03 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,003 $11,329 Implemented
OR0749 # 04 Y:2022 04 2022 REPLACE BOILER $122,100 $1,640,000 Implemented
OR0744 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,766 $8,671 Not Implemented
OR0744 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,963 $2,340 Implemented
OR0744 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $15,238 $36,792 Implemented
OR0744 # 01 Y:2021 01 2021 MINIMIZE WATER USAGE $2,348 $0 Implemented
OR0744 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,065 $18,105 Implemented
BS0108 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $6,587 $25,166 Not Implemented
BS0108 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,658 $290 Not Implemented
BS0108 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $165 Not Implemented
BS0108 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $443 $1,238 Not Implemented
BS0108 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,696 $1,050 Not Implemented
BS0108 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $240 $270 Not Implemented
OR0632 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $2,833 $0 Not Implemented
OR0632 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $500 Implemented
OR0632 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,285 $0 Not Implemented
OR0632 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,497 $2,837 Implemented
OR0632 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $3,802 $0 Not Implemented
OR0556 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,131 $2,861 Implemented
OR0556 # 07 Y:2010 07 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,397 $11,734 Not Implemented