Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0126 # 03 Y:2018 | 03 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,198 | $48,500 | Not Implemented |
WM0126 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $15,236 | Implemented |
WM0126 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,475 | $8,650 | Not Implemented |
WM0126 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $95,648 | $66,000 | Not Implemented |
WM0126 # 02 Y:2018 | 02 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $26,985 | $20,000 | Not Implemented |
WM0126 # 06 Y:2018 | 06 | 2018 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $6,480 | Implemented |
WM0126 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,101 | $2,850 | Not Implemented |
WM0126 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,864 | $0 | Not Implemented |
WM0126 # 07 Y:2018 | 07 | 2018 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,029 | $1,710 | Not Implemented |
IA0462 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,704 | $16,590 | Not Implemented |
IA0462 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,518 | $200 | Not Implemented |
IA0462 # 09 Y:2011 | 09 | 2011 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,450 | $1,000 | Not Implemented |
IA0462 # 08 Y:2011 | 08 | 2011 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $22,774 | $1,500 | Not Implemented |
IA0462 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,593 | $250 | Not Implemented |
IA0462 # 06 Y:2011 | 06 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,698 | $240 | Not Implemented |
IA0462 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,983 | $25,000 | Not Implemented |
IA0462 # 04 Y:2011 | 04 | 2011 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $59,656 | $20,000 | Not Implemented |
IA0462 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $2,818 | $1,530 | Not Implemented |
IA0462 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,158 | $15,702 | Not Implemented |
WI0506 # 07 Y:2006 | 07 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $990 | $1,500 | Implemented |
WI0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,430 | $0 | Implemented |
WI0506 # 05 Y:2006 | 05 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,795 | $800 | Implemented |
WI0506 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,973 | $16,740 | Implemented |
WI0506 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,049 | $0 | Implemented |
WI0506 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,464 | $0 | Not Implemented |