Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
346
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0811 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,312 | $750 | Implemented |
GT0811 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,824 | $20,700 | Implemented |
GT0811 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,135 | $3,000 | Implemented |
GT0811 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,119 | $5,334 | Not Implemented |
GT0811 # 01 Y:2005 | 01 | 2005 | IMPROVE LUBRICATION PRACTICES | $3,405 | $0 | Implemented |
GT0811 # 08 Y:2005 | 08 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $162,720 | $25,000 | Not Implemented |
GT0811 # 06 Y:2005 | 06 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,877 | $1,300 | Implemented |
GT0811 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,607 | $6,694 | Not Implemented |
MS0285 # 02 Y:2005 | 02 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $11,445 | $575 | Not Implemented |
MS0285 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $147,024 | $1,342,000 | Not Implemented |
MS0285 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,062 | $151 | Implemented |
MS0285 # 03 Y:2005 | 03 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,503 | $138 | Implemented |
MS0285 # 05 Y:2005 | 05 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $671 | $972 | Not Implemented |
OR0493 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,900 | $1,900 | Not Implemented |
OR0493 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,900 | $17,000 | Not Implemented |
OR0493 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $2,400 | $3,600 | Not Implemented |
OR0493 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $0 | Not Implemented |
OR0493 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,400 | $2,500 | Not Implemented |
OR0493 # 04 Y:2005 | 04 | 2005 | USE OPTIMUM TEMPERATURE | $11,000 | $13,000 | Not Implemented |
OR0493 # 03 Y:2005 | 03 | 2005 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $5,400 | $1,000 | Not Implemented |
OR0493 # 01 Y:2005 | 01 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $66,200 | $1,000 | Not Implemented |
WV0328 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,040 | $60 | Implemented |
WV0328 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $948 | $0 | Implemented |
WV0328 # 02 Y:2005 | 02 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,992 | $0 | Not Implemented |
WV0328 # 03 Y:2005 | 03 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,942 | $18,000 | Implemented |