IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0712 # 02 Y:2018 02 2018 REPLACE BOILER $56,825 $365,566 Not Implemented
OR0712 # 03 Y:2018 03 2018 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $33,804 $25,271 Not Implemented
OR0712 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,006 $21,662 Not Implemented
OR0712 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $17,619 $17,511 Implemented
OR0712 # 06 Y:2018 06 2018 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $6,403 $30,000 Implemented
OR0712 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $200,991 $689,600 Implemented
WM0126 # 02 Y:2018 02 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $26,985 $20,000 Not Implemented
WM0126 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,864 $0 Not Implemented
WM0126 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,101 $2,850 Not Implemented
WM0126 # 07 Y:2018 07 2018 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,029 $1,710 Not Implemented
WM0126 # 06 Y:2018 06 2018 REPAIR OR REPLACE STEAM TRAPS $7,154 $6,480 Implemented
WM0126 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $15,236 Implemented
WM0126 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,475 $8,650 Not Implemented
WM0126 # 03 Y:2018 03 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $14,198 $48,500 Not Implemented
WM0126 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $95,648 $66,000 Not Implemented
IC0207 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,822 $7,531 Not Implemented
IC0207 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,473 $13,820 Not Implemented
IC0207 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,822 $290 Not Implemented
IC0207 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,736 $7,996 Not Implemented
IP0107 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,840 $3,587 Implemented
IP0107 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $18,691 $85,000 Implemented
IP0107 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $629 $1,485 Not Implemented
IP0107 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,646 $9,560 Implemented
IP0107 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,610 $7,858 Implemented
IP0107 # 04 Y:2018 04 2018 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $957 $2,201 Implemented