IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

446

matching recommendations
Reset
NAICS 31191 Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0398 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $4,412 $0 Implemented
SF0398 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,241 $0 Implemented
SF0398 # 04 Y:2011 04 2011 AIR CONDITION ONLY SPACE NECESSARY $4,965 $424 Implemented
SF0398 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,927 $56,209 Implemented
SF0398 # 06 Y:2011 06 2011 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $136,531 $212,500 Not Implemented
SF0398 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $975 $2,405 Implemented
SF0398 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,046 $25,868 Not Implemented
SF0398 # 09 Y:2011 09 2011 MINIMIZE WATER USAGE $3,872 $1,867 Not Implemented
OK0804 # 01 Y:2011 01 2011 Install Anaerobic Digester $544,130 $5,652,880 Not Implemented
OK0804 # 02 Y:2011 02 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,961 $238,050 Not Implemented
OK0804 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $12,835 $19,625 Not Implemented
OK0804 # 04 Y:2011 04 2011 INSTALL SET-BACK TIMERS $740 $1,625 Not Implemented
OK0804 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,796 $56,474 Implemented
OK0804 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,996 $28,404 Not Implemented
OK0804 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $18,797 Not Implemented
OK0804 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,244 $4,120 Not Implemented
OK0804 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,362 $750 Implemented
OK0804 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,632 $4,325 Not Implemented
OK0804 # 11 Y:2011 11 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,295 $2,286 Not Implemented
OK0804 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $807 $1,843 Not Implemented
OK0804 # 13 Y:2011 13 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,107 $19,271 Not Implemented
OK0804 # 14 Y:2011 14 2011 OPTIMIZE PLANT POWER FACTOR $2,073 $8,279 Not Implemented
MZ0061 # 01 Y:2010 01 2010 USE OPTIMUM THICKNESS INSULATION $145 $300 Implemented
MZ0061 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $79 $1,200 Implemented
MZ0061 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,947 $2,160 Implemented