IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
NAICS 311920 Coffee and Tea Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0884 # 09 Y:2011 09 2011 OPTIMIZE PLANT POWER FACTOR $6,584 $37,790 Not Implemented
DL0029 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,200 $500 Not Implemented
DL0029 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,326 $4,000 Implemented
DL0029 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $44,793 $11,000 Implemented
DL0029 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,724 $75,600 Not Implemented
DL0029 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,700 $3,250 Not Implemented
SF0352 # 01 Y:2008 01 2008 USE PHOTOCELL CONTROLS $651 $664 Not Implemented
SF0352 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,436 $3,094 Not Implemented
SF0352 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,354 $1,767 Not Implemented
SF0352 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $405 $738 Not Implemented
SF0352 # 05 Y:2008 05 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,195 $21,950 Not Implemented
SF0352 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,658 $9,606 Not Implemented
SF0346 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,744 $100 Implemented
SF0346 # 02 Y:2007 02 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $474 $262 Not Implemented
SF0346 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,014 $1,859 Not Implemented
SF0346 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,284 $1,620 Not Implemented
SF0346 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,090 $11,740 Not Implemented
SF0346 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,037 $1,863 Not Implemented
SF0346 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $96,586 $193,493 Not Implemented
SF0346 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $721 $1,875 Not Implemented
UF0362 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,108 $706 Not Implemented
UF0362 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $5,310 $2,525 Not Implemented
UF0362 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,498 $0 Not Implemented
UF0362 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $767 $0 Not Implemented
UF0362 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $324 Not Implemented