Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 311920 | Coffee and Tea Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2412 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,854 | $5,915 | n/a |
LS2412 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $872 | $135 | n/a |
LS2412 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $2,908 | $275 | n/a |
LS2412 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,703 | $150 | n/a |
LS2411 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $266 | $45 | n/a |
LS2411 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,595 | $50 | n/a |
LS2411 # 03 Y:2024 | 03 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $26,395 | $18,900 | n/a |
LS2411 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,962 | $12,050 | n/a |
LS2411 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $72,136 | $480,000 | n/a |
LS2402 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,000 | $12,500 | Implemented |
LS2402 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,573 | $125 | Implemented |
LS2402 # 01 Y:2024 | 01 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $35,595 | $0 | Implemented |
LS1903 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $135 | $0 | Implemented |
LS1903 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,445 | $2,189 | Not Implemented |
LS1903 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $45 | $0 | Implemented |
LS1903 # 04 Y:2019 | 04 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $480 | $240 | Not Implemented |
LS1903 # 03 Y:2019 | 03 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $839 | $0 | Implemented |
LS1903 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,079 | $150 | Not Implemented |
LS0012 # 06 Y:2017 | 06 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,215 | $80,000 | Not Implemented |
LS0012 # 05 Y:2017 | 05 | 2017 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,685 | $4,250 | Not Implemented |
LS0012 # 04 Y:2017 | 04 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,748 | $15,200 | Not Implemented |
LS0012 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $993 | $548 | Not Implemented |
LS0012 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,205 | $920 | Not Implemented |
LS0012 # 01 Y:2017 | 01 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $28,766 | $12,000 | Not Implemented |
LL0180 # 01 Y:2004 | 01 | 2004 | INSTALL OCCUPANCY SENSORS | $5,529 | $100 | Implemented |