IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 311999 All Other Miscellaneous Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0397 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $15,024 $14,500 Not Implemented
BD0397 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,550 $6,000 Not Implemented
BD0397 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $6,237 $4,440 Not Implemented
BD0397 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,796 $765 Not Implemented
BD0397 # 06 Y:2011 06 2011 INSTALL TURBULATORS $4,508 $1,500 Not Implemented
BD0397 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,439 $650 Not Implemented
BD0397 # 08 Y:2011 08 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,214 $5,820 Not Implemented
BD0397 # 01 Y:2011 01 2011 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,085 $6,000 Not Implemented
DL0066 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,701 $1,257 Not Implemented
DL0066 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,163 $3,750 Not Implemented
DL0066 # 06 Y:2011 06 2011 UPGRADE CONTROLS ON COMPRESSORS $12,600 $10,000 Not Implemented
DL0066 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,015 $4,000 Implemented
DL0066 # 03 Y:2011 03 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,460 $2,000 Implemented
DL0066 # 02 Y:2011 02 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $101,455 $36,300 Not Implemented
DL0066 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,035 Implemented
IA0462 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,158 $15,702 Not Implemented
IA0462 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,704 $16,590 Not Implemented
IA0462 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,818 $1,530 Not Implemented
IA0462 # 04 Y:2011 04 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,656 $20,000 Not Implemented
IA0462 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $15,983 $25,000 Not Implemented
IA0462 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,698 $240 Not Implemented
IA0462 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,593 $250 Not Implemented
IA0462 # 08 Y:2011 08 2011 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $22,774 $1,500 Not Implemented
IA0462 # 09 Y:2011 09 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,450 $1,000 Not Implemented
IA0462 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,518 $200 Not Implemented