IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

912

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0233 # 02 Y:2020 02 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $848 $50 Implemented
UA0233 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $1,068 Implemented
UA0233 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,500 $20 Implemented
UA0233 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $658 $185 Implemented
UK2004 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,031 $21,360 Implemented
UK2004 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,779 $0 Implemented
UK2004 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,067 $2,630 Implemented
UK2004 # 04 Y:2020 04 2020 INCREASE AMOUNT OF CONDENSATE RETURNED $360,000 $250,000 Implemented
UK2004 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $52,668 $24,890 Implemented
UK2004 # 06 Y:2020 06 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $71,487 $150,900 Implemented
UK2004 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $102,672 $4,000 Implemented
UK2004 # 09 Y:2020 09 2020 OPTIMIZE PLANT POWER FACTOR $40,258 $23,660 Implemented
UK2003 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $4,628 $1,586 Implemented
UK2003 # 05 Y:2020 05 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,645 $28,100 Implemented
UK2003 # 07 Y:2020 07 2020 MINIMIZE WATER USAGE $27,840 $15,000 Implemented
UF0550 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $41,888 $29,990 Implemented
UF0550 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,802 $30,000 Implemented
UF0550 # 03 Y:2020 03 2020 INSTALL TURBULATORS $3,921 $11,250 Implemented
UF0550 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,928 $2,800 Implemented
UF0550 # 05 Y:2020 05 2020 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $383,788 $897,972 Implemented
SF0550 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,782 $1,359 Implemented
SF0550 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $1,259 $787 Implemented
SF0550 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,899 $4,002 Implemented
SF0550 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,809 $17,557 Implemented
SF0550 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,560 $12,365 Implemented