IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0157 # 06 Y:2016 06 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,700 $44,740 Implemented
DL0157 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,170 $77,500 Implemented
DL0157 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $14,500 $53,850 Not Implemented
DL0157 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,440 $46,960 Implemented
WV0473 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,047 $31,578 Not Implemented
WV0473 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,907 $8,793 Not Implemented
WV0473 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,804 $1,700 Implemented
WV0473 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,703 $1,000 Implemented
WV0473 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,539 $7,466 Implemented
WV0473 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $2,574 $3,281 Implemented
WV0473 # 07 Y:2013 07 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,724 $617 Not Implemented
WV0473 # 08 Y:2013 08 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,529 $3,263 Not Implemented
WV0473 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $497 $566 Implemented
WV0473 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $29 Implemented
DL0055 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $31,870 $13,000 Not Implemented
DL0055 # 02 Y:2010 02 2010 REPLACE BOILER $59,500 $102,000 Not Implemented
DL0055 # 03 Y:2010 03 2010 OPERATE BOILERS ON HIGH FIRE SETTING $35,000 $50 Not Implemented
DL0055 # 04 Y:2010 04 2010 REPLACE TREATED WATER WITH WELL / SURFACE WATER $39,150 $100,000 Not Implemented
DL0055 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,808 $125,000 Implemented
DL0055 # 06 Y:2010 06 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $9,000 $3,000 Implemented
DL0055 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,600 $1,200 Implemented
DL0055 # 08 Y:2010 08 2010 REDUCE VENTILATION AIR $21,000 $15,000 Not Implemented
DL0055 # 09 Y:2010 09 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $23,200 $15,000 Not Implemented
DL0055 # 10 Y:2010 10 2010 KEEP EQUIPMENT CLEAN $3,631 $500 Implemented
DL0055 # 11 Y:2010 11 2010 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,631 $1,830 Implemented