IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0406 # 03 Y:2007 03 2007 INSTALL SET-BACK TIMERS $6,690 $625 Not Implemented
UF0406 # 04 Y:2007 04 2007 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $6,004 $399 Not Implemented
UF0406 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $17,857 $619 Implemented
UF0406 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,557 $714 Implemented
UF0406 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $229,959 $0 Implemented
UF0406 # 08 Y:2007 08 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,754 $22,000 Not Implemented
UF0406 # 09 Y:2007 09 2007 USE OPTIMUM THICKNESS INSULATION $7,084 $1,380 Implemented
UF0406 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,733 $6,479 Not Implemented
UF0406 # 11 Y:2007 11 2007 INSTALL AN UNINTERUPTABLE POWER SUPPLY $4,744,561 $5,831 Not Implemented
UF0395 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,451 $4,491 Implemented
UF0395 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $3,897 $345 Implemented
UF0395 # 03 Y:2007 03 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,587 $50 Implemented
UF0395 # 04 Y:2007 04 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,469 $133 Not Implemented
UF0395 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,409 $30 Implemented
UF0395 # 06 Y:2007 06 2007 INSTALL SKYLIGHTS $19,110 $35,054 Implemented
UF0395 # 07 Y:2007 07 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,509 $9,776 Not Implemented
UF0395 # 08 Y:2007 08 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $200 $0 Not Implemented
UF0395 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $2,508 $752 Not Implemented
UF0395 # 10 Y:2007 10 2007 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $77,607 $31,201 Implemented
UF0395 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,271 $0 Implemented
UF0395 # 12 Y:2007 12 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $53,219 $20,339 Implemented
UF0395 # 13 Y:2007 13 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $180,645 $263,004 Implemented
UF0388 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,746 $4,846 Not Implemented
UF0388 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,378 $1,688 Not Implemented
UF0388 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $341 $342 Not Implemented