IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,864

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0406 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,557 $714 Implemented
UF0406 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $229,959 $0 Implemented
UF0406 # 08 Y:2007 08 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,754 $22,000 Not Implemented
UF0406 # 09 Y:2007 09 2007 USE OPTIMUM THICKNESS INSULATION $7,084 $1,380 Implemented
UF0406 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,733 $6,479 Not Implemented
UF0406 # 11 Y:2007 11 2007 $4,744,561 $5,831 Not Implemented
DL0008 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $40,014 $14,000 Implemented
DL0008 # 02 Y:2007 02 2007 REPLACE BOILER $33,159 $102,000 Not Implemented
DL0008 # 03 Y:2007 03 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,900 $0 Implemented
DL0008 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,801 $175,000 Implemented
DL0008 # 05 Y:2007 05 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $18,000 $1,000 Implemented
DL0008 # 06 Y:2007 06 2007 REPLACE BOILER $12,509 $27,400 Not Implemented
DL0008 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,978 $2,105 Implemented
DL0008 # 08 Y:2007 08 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,800 $900 Implemented
DL0008 # 09 Y:2007 09 2007 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $2,893 $14,000 Not Implemented
DL0008 # 10 Y:2007 10 2007 INSTALL OCCUPANCY SENSORS $754 $285 Implemented
IA0414 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,590 $3,793 Not Implemented
IA0414 # 02 Y:2007 02 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $501 $118 Not Implemented
IA0414 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $807 $262 Not Implemented
IA0414 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $163 Not Implemented
IA0414 # 05 Y:2007 05 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $2,721 $1,300 Not Implemented
LE0262 # 01 Y:2007 01 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $204,947 $1,684,540 Not Implemented
LE0262 # 02 Y:2007 02 2007 REPAIR OR REPLACE STEAM TRAPS $427,857 $118,000 Not Implemented
LE0262 # 03 Y:2007 03 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $173,079 $300,000 Not Implemented
LE0262 # 04 Y:2007 04 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,106 $75,000 Not Implemented