IAC logo
Search IAC Recommendations
Sponsored by:
EERE AMO
IAC logo
Search IAC Recommendations

1,718

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0205 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $5,926 $1,000 Implemented
SU0205 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $822 $1,010 Implemented
SU0205 # 07 Y:2005 07 2005 $2,182,664 $3,516,395 Not Implemented
SF0290 # 01 Y:2004 01 2004 REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE $13,186 $0 Not Implemented
SF0290 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,309 $0 Implemented
SF0290 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,072 $0 Not Implemented
SF0290 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,231 $617 Not Implemented
SF0290 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,496 $4 Not Implemented
SF0290 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,732 $2 Implemented
SF0290 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,456 $15 Not Implemented
SF0290 # 08 Y:2004 08 2004 USE PHOTOCELL CONTROLS $708 $600 Implemented
SF0290 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,885 $6 Implemented
SF0290 # 10 Y:2004 10 2004 REPAIR AND ELIMINATE STEAM LEAKS $870 $1,019 Implemented
SF0290 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $643 $854 Implemented
SF0290 # 12 Y:2004 12 2004 INSTALL OCCUPANCY SENSORS $494 $646 Implemented
SF0290 # 13 Y:2004 13 2004 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $16,014 $0 Not Implemented
SF0290 # 14 Y:2004 14 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,900 $20,000 Not Implemented
SF0290 # 15 Y:2004 15 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $130,619 $218,815 Not Implemented
LE0199 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,230 $16,000 n/a
LE0199 # 02 Y:2004 02 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,780 $15,000 Not Implemented
LE0199 # 03 Y:2004 03 2004 INSULATE FEEDWATER TANK $8,188 $2,220 Implemented
LE0199 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $300 Implemented
LE0199 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,019 $1,884 Not Implemented
NC0291 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $68,169 $77,000 Not Implemented
NC0291 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,122 $9,500 Implemented