IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,875

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0369 # 06 Y:2005 06 2005 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,471 $900 Not Implemented
UF0369 # 07 Y:2005 07 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,189 $5,000 Not Implemented
UF0369 # 08 Y:2005 08 2005 $0 $0 Not Implemented
UF0367 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $124 $0 Implemented
UF0367 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $200 $0 Not Implemented
UF0367 # 03 Y:2005 03 2005 ELIMINATE A BY-PRODUCT $4,483 $870 Implemented
UF0367 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,578 $0 Implemented
UF0367 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,614 $3,948 Implemented
UF0367 # 06 Y:2005 06 2005 ELIMINATE A BY-PRODUCT $426 $300 Not Implemented
UF0367 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,974 $700 Implemented
UF0367 # 08 Y:2005 08 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,198 $23,500 Not Implemented
AS0403 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,641 $1,000 Not Implemented
AS0403 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,622 $10,000 Not Implemented
AS0403 # 03 Y:2005 03 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $15,050 $2,000 Not Implemented
AS0403 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,834 $27,518 Not Implemented
AS0403 # 05 Y:2005 05 2005 USE SOLAR HEAT TO HEAT WATER $580 $3,600 Not Implemented
MI0104 # 01 Y:2005 01 2005 HEAT WATER WITH EXHAUST HEAT $315,984 $128,000 Not Implemented
MI0104 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,384 $1,300 Not Implemented
MI0104 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,889 $600 Not Implemented
MI0104 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,821 $3,010 Not Implemented
MI0104 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,246 $10,198 Not Implemented
MI0104 # 06 Y:2005 06 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,160 $5,060 Not Implemented
MI0103 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $61,700 $195,000 Not Implemented
MI0103 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,798 $906 Not Implemented
MI0103 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,613 $6,960 Not Implemented