IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations

1,829

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0615 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $1,182 Implemented
LS2116 # 01 Y:2021 01 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,222 $300 Implemented
LS2116 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $4,408 $250 Implemented
LS2116 # 03 Y:2021 03 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,943 $4,200 Not Implemented
LS2116 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $19,226 $35,236 Not Implemented
LS2116 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $35,399 $646,020 Not Implemented
UK2106 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,964 $0 n/a
UK2106 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,660 n/a
UK2106 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,035 $2,510 n/a
UK2106 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $330 $80 n/a
UK2106 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $267 $100 n/a
UK2106 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,142 $640 n/a
UK2106 # 08 Y:2021 08 2021 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $731,255 $3,500,000 n/a
UK2106 # 09 Y:2021 09 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $49,643 $75,000 n/a
UK2106 # 10 Y:2021 10 2021 INSULATE BARE EQUIPMENT $1,250 $881 n/a
UK2106 # 11 Y:2021 11 2021 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,154 $600 n/a
UK2106 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,854 $1,665 n/a
SD0612 # 01 Y:2021 01 2021 REDESIGN PROCESS $39,942 $13,000 Implemented
SD0612 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,879 $12,356 Implemented
SD0612 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,826 $9,545 Implemented
SD0612 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $957 $0 Implemented
SD0612 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,530 $9,245 Not Implemented
SD0612 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,883 $2,800 Not Implemented
SD0612 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $14,829 $44,568 Not Implemented
SD0612 # 08 Y:2021 08 2021 REPAIR AND ELIMINATE STEAM LEAKS $557 $1,000 Implemented