IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,875

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0958 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $151,488 $44,117 Not Implemented
GT0958 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $326 $200 Not Implemented
GT0958 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $368,765 $3,913,242 Not Implemented
SF0580 # 01 Y:2021 01 2021 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,446 $0 Implemented
SF0580 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,288 $1,410 Not Implemented
SF0580 # 03 Y:2021 03 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $69,715 $64,882 Not Implemented
SF0580 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,463 $18,200 Implemented
SF0580 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,242 $2,702 Implemented
SF0580 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $228 $574 Implemented
SF0580 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $19,936 $49,917 Implemented
OR0745 # 01 Y:2021 01 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $11,633 $395 Implemented
OR0745 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,360 $542 Implemented
OR0745 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,286 $485 Implemented
UK2107 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,932 $3,950 n/a
UK2107 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,788 $0 n/a
UK2107 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $662 $150 n/a
UK2107 # 04 Y:2021 04 2021 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,257 $1,770 n/a
UK2107 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $2,733 $2,931 n/a
UK2107 # 06 Y:2021 06 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,085 $797 n/a
SD0615 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,310 $6,942 Implemented
SD0615 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $540 $0 Implemented
SD0615 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $1,182 Implemented
LS2116 # 01 Y:2021 01 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,222 $300 Implemented
LS2116 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $4,408 $250 Implemented
LS2116 # 03 Y:2021 03 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,943 $4,200 Not Implemented