IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0051 # 01 Y:2015 01 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,391 $27 Implemented
IP0051 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,824 $161 Implemented
IP0051 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,313 $261 Implemented
IP0051 # 04 Y:2015 04 2015 RECYCLE WHITE WATER $1,246 $108 Implemented
IP0051 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,713 $534 Not Implemented
IP0051 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,349 $2,149 Not Implemented
IP0051 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127 $255 Implemented
IP0051 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $4,646 $12,637 Not Implemented
IP0051 # 09 Y:2015 09 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $7,963 $24,900 Not Implemented
SF0474 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,699 $0 Implemented
SF0474 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $7,582 $31,836 Not Implemented
SF0474 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,169 $0 Implemented
SF0474 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $1,240 $4,506 Not Implemented
SF0474 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,353 $39,333 Implemented
SF0474 # 10 Y:2015 10 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,060 $29,463 Implemented
SF0474 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,501 $5,010 Implemented
SF0474 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $60,323 $13,006 Not Implemented
SF0474 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $37,843 $0 Implemented
SF0474 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,400 $6,155 Implemented
SF0472 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,587 $527 Implemented
SF0472 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,873 $4,287 Implemented
SF0472 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $3,897 $6,325 Implemented
SF0472 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,245 $18,586 Not Implemented
SF0472 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,003 $19,142 Implemented
SF0469 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $660 $1,671 Not Implemented