Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0595 # 03 Y:2024 | 03 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,366 | $166 | n/a |
AS0595 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $132 | $254 | n/a |
AS0595 # 02 Y:2024 | 02 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $3,901 | $142 | n/a |
AS0595 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,614 | $149,397 | n/a |
AS0595 # 04 Y:2024 | 04 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $420 | $72 | n/a |
AS0595 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $336 | $44 | n/a |
AS0595 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $255 | $197 | n/a |
CI0038 # 05 Y:2024 | 05 | 2024 | USE PHOTOCELL CONTROLS | $4,714 | $1,500 | n/a |
CI0038 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $8,867 | $17,866 | n/a |
CI0038 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,400 | $1,000 | n/a |
CI0038 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $765 | $3,000 | n/a |
CI0038 # 09 Y:2024 | 09 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $577 | $150 | n/a |
CI0038 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,786 | $792 | n/a |
CI0038 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,768 | $242,254 | n/a |
CI0038 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $28,800 | $10,000 | n/a |
CI0038 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,690 | $1,100 | n/a |
UF0623 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $979 | $3,750 | n/a |
UF0623 # 03 Y:2024 | 03 | 2024 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,089 | $5,440 | n/a |
UF0623 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $958 | $1,400 | n/a |
UF0623 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,088 | $3,402 | n/a |
UF0623 # 04 Y:2024 | 04 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,627 | $2,343 | n/a |
UF0623 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,616 | $0 | n/a |
UF0623 # 02 Y:2024 | 02 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,057 | $4,000 | n/a |
UF0623 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $56,000 | $20,720 | n/a |
GT0986 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $463,303 | $2,451,174 | n/a |