IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

418

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2409 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $240,871 $7,750 Implemented
UW2409 # 06 Y:2024 06 2024 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $72,261 $271,830 Implemented
UW2409 # 04 Y:2024 04 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $16,446 $18,600 Implemented
UW2409 # 07 Y:2024 07 2024 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $24,670 $223,625 Implemented
UW2409 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $1,927 $2,080 Implemented
UW2409 # 05 Y:2024 05 2024 REPLACE BOILER $61,679 $155,400 Implemented
UW2409 # 03 Y:2024 03 2024 TREAT AND REUSE RINSE WATERS $1,034,601 $300,000 Implemented
OR0786 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $7,048 $108,930 Implemented
OR0786 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,522 $2,500 Implemented
OR0786 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,491 $0 Implemented
OR0786 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,567 $726 Implemented
CM1029 # 04 Y:2023 04 2023 REPLACE BOILER $8,337 $38,130 Implemented
CM1029 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,800 $0 Implemented
CM1029 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,117 $8,000 Implemented
AS0567 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,430 $774,239 Implemented
DL0228 # 01 Y:2023 01 2023 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $4,024 $700 Implemented
DL0228 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,279 $0 Implemented
UU0229 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,527 $5,600 Implemented
UU0229 # 03 Y:2023 03 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $4,945 $3,480 Implemented
UU0229 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $2,146 $3,060 Implemented
DL0223 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $9,025 $0 Implemented
DL0223 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,437 $1,030 Implemented
DL0223 # 04 Y:2023 04 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $994 $4,800 Implemented
DL0219 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,974 $10,600 Implemented
DL0219 # 04 Y:2023 04 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,827 $0 Implemented