Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
969
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0055 # 11 Y:2010 | 11 | 2010 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,631 | $1,830 | Implemented |
DL0055 # 12 Y:2010 | 12 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,467 | $6,000 | Implemented |
DL0055 # 13 Y:2010 | 13 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,935 | $2,840 | Not Implemented |
MI0191 # 01 Y:2010 | 01 | 2010 | HEAT WATER WITH EXHAUST HEAT | $697,331 | $128,000 | Not Implemented |
MI0191 # 02 Y:2010 | 02 | 2010 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $228,145 | $400,000 | Not Implemented |
MI0191 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $48,196 | $1,500 | Not Implemented |
MI0191 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $47,683 | $1,210 | Implemented |
MI0191 # 05 Y:2010 | 05 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,572 | $5,300 | Implemented |
LE0298 # 01 Y:2010 | 01 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $77,015 | $56,771 | Not Implemented |
LE0298 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,178 | $100,000 | Implemented |
LE0298 # 03 Y:2010 | 03 | 2010 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $8,306 | $20,000 | Not Implemented |
LE0298 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,050 | $2,440 | Implemented |
LE0298 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,536 | $6,000 | Not Implemented |
LE0298 # 06 Y:2010 | 06 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $4,726 | $3,900 | Not Implemented |
LE0298 # 07 Y:2010 | 07 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,787 | $4,200 | Not Implemented |
LE0298 # 08 Y:2010 | 08 | 2010 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,423 | $1,750 | Not Implemented |
LE0298 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,592 | $12,000 | Not Implemented |
LE0298 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $327 | $630 | Implemented |
SD0427 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,780 | $100 | Not Implemented |
SD0427 # 02 Y:2010 | 02 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,494 | $2,714 | Not Implemented |
SD0427 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,124 | $1,230 | Not Implemented |
SD0427 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,450 | $10,035 | Not Implemented |
SD0427 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $486 | $2,200 | Not Implemented |
SD0427 # 06 Y:2010 | 06 | 2010 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $540,797 | $1,949,400 | Not Implemented |
UF0429 # 01 Y:2009 | 01 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,635 | $0 | Implemented |