IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

915

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0805 # 17 Y:2009 17 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,423 $0 Not Implemented
UD0805 # 18 Y:2009 18 2009 ISOLATE HOT OR COLD EQUIPMENT $666 $0 Implemented
DL0037 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $105,200 $0 Implemented
DL0037 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $644 $140 Implemented
DL0037 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,050 $5,000 Not Implemented
DL0037 # 04 Y:2009 04 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,500 $880 Not Implemented
DL0037 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,330 $8,800 Not Implemented
DL0037 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,254 $35,000 Not Implemented
DL0024 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $160,536 $150,000 Not Implemented
DL0024 # 02 Y:2008 02 2008 REPLACE BOILER $116,210 $102,000 Not Implemented
DL0024 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,865 $11,000 Implemented
DL0024 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,421 $3,877 Not Implemented
DL0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $10,800 $1,200 Implemented
DL0024 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,200 $112,000 Implemented
UA0021 # 01 Y:2008 01 2008 UPGRADE CONTROLS ON COMPRESSORS $12,169 $6,000 Not Implemented
UA0021 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,811 $2,000 Implemented
UA0021 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,288 $3,000 Implemented
UA0021 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,835 $0 Implemented
UA0021 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,804 $8,000 Not Implemented
UA0021 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $4,292 $2,550 Not Implemented
UA0021 # 07 Y:2008 07 2008 REPAIR AND ELIMINATE STEAM LEAKS $6,002 $986 Implemented
UA0021 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $278 $271 Not Implemented
UA0021 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,436 $49,534 Not Implemented
UA0021 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,186 $1,050 Not Implemented
UA0021 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,899 $37,307 Not Implemented