IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

969

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0429 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,766 $0 Implemented
UF0429 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,130 $0 Not Implemented
UF0429 # 04 Y:2009 04 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,899 $0 Not Implemented
UF0429 # 05 Y:2009 05 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $334 $0 Implemented
UF0429 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,625 $0 Not Implemented
UF0429 # 07 Y:2009 07 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $45,514 $0 Not Implemented
UF0429 # 08 Y:2009 08 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,119 $0 Not Implemented
UF0429 # 09 Y:2009 09 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $19,795 $0 Not Implemented
UF0429 # 10 Y:2009 10 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,346 $0 Not Implemented
UF0429 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,435 $0 Not Implemented
UF0429 # 12 Y:2009 12 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,025 $0 Not Implemented
UF0429 # 13 Y:2009 13 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,269 $0 Implemented
UF0429 # 14 Y:2009 14 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $68,295 $0 Not Implemented
UD0805 # 01 Y:2009 01 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $39,022 $12,000 Not Implemented
UD0805 # 02 Y:2009 02 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,769 $25,000 Not Implemented
UD0805 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,619 $17,147 Implemented
UD0805 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,872 $25,117 Implemented
UD0805 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $10,974 $2,000 Not Implemented
UD0805 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,710 $16,000 Not Implemented
UD0805 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,327 $8,043 Implemented
UD0805 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,938 $6,703 Implemented
UD0805 # 09 Y:2009 09 2009 REDUCE EXCESSIVE BOILER BLOWDOWN $5,312 $5,000 Implemented
UD0805 # 10 Y:2009 10 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,119 $0 Implemented
UD0805 # 11 Y:2009 11 2009 INSULATE BARE EQUIPMENT $3,797 $4,283 Implemented
UD0805 # 12 Y:2009 12 2009 CHECK FOR ACCURACY OF UTILITY / POWER METERS $3,741 $0 Not Implemented