IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

904

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0997 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,415 $2,668 Implemented
OK0997 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,238 $0 Implemented
OK0997 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,715 $1,306 Implemented
OK0997 # 07 Y:2019 07 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,032 $0 Implemented
OK0997 # 08 Y:2019 08 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,875 $0 Implemented
OK0997 # 09 Y:2019 09 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $663 $2,640 Not Implemented
OK0997 # 10 Y:2019 10 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $366 $485 Implemented
LS1812 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,387 $50 Not Implemented
LS1812 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $17,980 $20,000 Not Implemented
LS1812 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,886 $17,000 Implemented
LS1812 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,243 $13,500 Not Implemented
AM0757 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $65,410 $255 Implemented
AM0757 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,154 $1,140 Implemented
AM0757 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $25,420 $82,110 Not Implemented
AM0757 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,856 $3,000 Implemented
AM0757 # 05 Y:2018 05 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $47,160 $136 Implemented
AM0757 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,069 $28,981 Implemented
AM0757 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,340 $17 Implemented
UA0197 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,401 $5,562 Implemented
UA0197 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,943 $2,465 Implemented
UA0197 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,667 $500 Not Implemented
UA0197 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $5,489 $0 Not Implemented
AS0454 # 01 Y:2018 01 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $274,952 $196,499 Not Implemented
AS0454 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $4,026 $3,043 Not Implemented
AS0454 # 05 Y:2018 05 2018 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $11,530 $150 Not Implemented