Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1028 # 06 Y:2020 | 06 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $258 | $616 | Not Implemented |
OK1028 # 05 Y:2020 | 05 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,802 | $8,260 | Not Implemented |
OK1028 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $53 | $111 | Not Implemented |
OK1028 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,990 | $3,313 | Not Implemented |
OK1028 # 02 Y:2020 | 02 | 2020 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,193 | $3,750 | Not Implemented |
OK1028 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,729 | $1,500 | Not Implemented |
OR0734 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,078 | $220 | Not Implemented |
OR0734 # 02 Y:2020 | 02 | 2020 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $44,429 | $117,388 | Not Implemented |
OR0734 # 03 Y:2020 | 03 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $20,357 | $6,830 | Not Implemented |
OR0734 # 01 Y:2020 | 01 | 2020 | INCREASE USE OF AUTOMATION | $126,455 | $360,000 | Not Implemented |
UF0550 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,802 | $30,000 | Implemented |
UF0550 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $41,888 | $29,990 | Implemented |
UF0550 # 04 Y:2020 | 04 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,928 | $2,800 | Implemented |
UF0550 # 05 Y:2020 | 05 | 2020 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $383,788 | $897,972 | Implemented |
UF0550 # 03 Y:2020 | 03 | 2020 | INSTALL TURBULATORS | $3,921 | $11,250 | Implemented |
UA0221 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,796 | $7,800 | Implemented |
UA0221 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,795 | $50 | Not Implemented |
UA0221 # 03 Y:2020 | 03 | 2020 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,121 | $0 | Implemented |
UA0221 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,863 | $4,000 | Implemented |
UA0221 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,898 | $8,350 | Not Implemented |
AM0797 # 09 Y:2020 | 09 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $725 | $730 | Implemented |
AM0797 # 08 Y:2020 | 08 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $860 | $60 | Implemented |
AM0797 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,280 | $22,200 | Implemented |
AM0797 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $5,725 | $420 | Implemented |
AM0797 # 03 Y:2020 | 03 | 2020 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,500 | $20,000 | Implemented |