Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0717 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,679 | $4,082 | Implemented |
MA0717 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,986 | $5,700 | Implemented |
MA0717 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,036 | $8,700 | Not Implemented |
MA0717 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,293 | $8,275 | Implemented |
MA0717 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,124 | $14,700 | Not Implemented |
AM0641 # 02 Y:2013 | 02 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $45,620 | $50,000 | Implemented |
AM0641 # 01 Y:2013 | 01 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $81,000 | $40,000 | Implemented |
AM0641 # 08 Y:2013 | 08 | 2013 | USE SYNTHETIC LUBRICANT | $1,980 | $0 | Not Implemented |
AM0641 # 07 Y:2013 | 07 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,940 | $220 | Not Implemented |
AM0641 # 06 Y:2013 | 06 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,580 | $500 | Implemented |
AM0641 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,130 | $610 | Implemented |
AM0641 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $4,800 | $1,800 | Implemented |
AM0641 # 03 Y:2013 | 03 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,894 | $31,100 | Implemented |
SD0471 # 10 Y:2013 | 10 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $1,926 | $200 | Implemented |
SD0471 # 09 Y:2013 | 09 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,810 | $18,500 | Not Implemented |
SD0471 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,126 | $3,300 | Implemented |
SD0471 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,316 | $500 | Not Implemented |
SD0471 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,423 | $100,248 | Implemented |
SD0471 # 05 Y:2013 | 05 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $34,337 | $110,000 | Not Implemented |
SD0471 # 04 Y:2013 | 04 | 2013 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $79,351 | $96,000 | Not Implemented |
SD0471 # 03 Y:2013 | 03 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $92,696 | $131,400 | Not Implemented |
SD0471 # 02 Y:2013 | 02 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $277,284 | $353,400 | Not Implemented |
SD0471 # 01 Y:2013 | 01 | 2013 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $629,471 | $234,900 | Not Implemented |
OK0840 # 11 Y:2013 | 11 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,220 | $3,650 | Not Implemented |
OK0840 # 12 Y:2013 | 12 | 2013 | INSTALL SET-BACK TIMERS | $2,987 | $2,259 | Implemented |