Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1028 # 06 Y:2020 | 06 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $258 | $616 | Not Implemented |
OK1028 # 05 Y:2020 | 05 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,802 | $8,260 | Not Implemented |
OK1028 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $53 | $111 | Not Implemented |
OK1028 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,990 | $3,313 | Not Implemented |
OK1028 # 02 Y:2020 | 02 | 2020 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,193 | $3,750 | Not Implemented |
OK1028 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,729 | $1,500 | Not Implemented |
UF0550 # 05 Y:2020 | 05 | 2020 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $383,788 | $897,972 | Implemented |
UF0550 # 04 Y:2020 | 04 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,928 | $2,800 | Implemented |
UF0550 # 03 Y:2020 | 03 | 2020 | INSTALL TURBULATORS | $3,921 | $11,250 | Implemented |
UF0550 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,802 | $30,000 | Implemented |
UF0550 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $41,888 | $29,990 | Implemented |
UA0221 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,898 | $8,350 | Not Implemented |
UA0221 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,863 | $4,000 | Implemented |
UA0221 # 03 Y:2020 | 03 | 2020 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,121 | $0 | Implemented |
UA0221 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,795 | $50 | Not Implemented |
UA0221 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,796 | $7,800 | Implemented |
AM0797 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $17,410 | $34,210 | Implemented |
AM0797 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,400 | $2,000 | Implemented |
AM0797 # 03 Y:2020 | 03 | 2020 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,500 | $20,000 | Implemented |
AM0797 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,799 | $400 | Implemented |
AM0797 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $5,725 | $420 | Implemented |
AM0797 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,280 | $22,200 | Implemented |
AM0797 # 07 Y:2020 | 07 | 2020 | USE SYNTHETIC LUBRICANT | $5,500 | $200 | Implemented |
AM0797 # 08 Y:2020 | 08 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $860 | $60 | Implemented |
AM0797 # 09 Y:2020 | 09 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $725 | $730 | Implemented |