IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 312112 Bottled Water Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0395 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,409 $30 Implemented
UF0395 # 06 Y:2007 06 2007 INSTALL SKYLIGHTS $19,110 $35,054 Implemented
UF0395 # 07 Y:2007 07 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,509 $9,776 Not Implemented
UF0395 # 08 Y:2007 08 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $200 $0 Not Implemented
UF0395 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $2,508 $752 Not Implemented
UF0395 # 10 Y:2007 10 2007 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $77,607 $31,201 Implemented
UF0395 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,271 $0 Implemented
UF0395 # 12 Y:2007 12 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $53,219 $20,339 Implemented
UF0395 # 13 Y:2007 13 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $180,645 $263,004 Implemented
AM0508 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $8,400 $2,190 Not Implemented
AM0508 # 02 Y:2006 02 2006 $7,024 $0 Not Implemented
AM0508 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $500 Not Implemented
AM0508 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $2,700 $270 Not Implemented
AM0508 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $140 Not Implemented
AM0508 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $210 $50 Not Implemented
AM0508 # 07 Y:2006 07 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $190 $0 Not Implemented
AM0508 # 08 Y:2006 08 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,980 $500 Not Implemented
UU0098 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,060 $0 Implemented
UU0098 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $2,100 Implemented
UU0098 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,690 $1,000 Implemented
UU0098 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $410 $2,880 Implemented
UU0098 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $2,380 $2,040 Implemented
UM0231 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,750 $7,445 Not Implemented
UM0231 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,000 $2,250 Not Implemented
UM0231 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,320 $1,500 Not Implemented